Project Description

North Grimes Roadway Project

N.M.P. St-(M)-4494(201)

The City of Hobbs retained PETTIGREW & ASSOCIATES to provide design and construction engineering services for one mile of a major arterial collector (originally a four lane roadway). The improvements included five lanes with curb and gutter, drainage structures and utility relocation. A major effort for this project was the drainage study. This study was used as the basis of design for Millen Drive, the Access and Development Road, and Tumbleweed Drive. It was also incorporated into the City of Hobbs Master Drainage Plan.

The scope of work included:

  • Geotechnical Investigation
  • Preliminary Surveys For Design
  • Preliminary, Geometric, Pavement (Concrete & Asphalt) Design
  • Final Design Report
  • Final Scoping Report
  • Preliminary & Final Roadway Design Plans
  • Traffic Forecasting and Capacity Analysis
  • Drainage Analysis & Report
  • Preparation of Bidding Documents
  • Construction Staking, Testing, and Inspection
  • Confirmation of Right of Way
  • Preparation of Project Construction Documents
  • Preconstruction Surveying
  • Construction Engineering Services